Deliverables - Public
D6.3 - Systematic literature review of empirical analyses on the social acceptability of CaL-based CCUS technologies
D6.3 provides a systematic review of the literature on the level of knowledge/awareness of CCUS technologies, their social acceptability and the drivers and barriers of such social acceptability
D4.3 - Base-cases definitions and KPI calculation for cement, steel, Bio-CHP and WtE plants with and without capture
The first part of deliverable D4.3 provides a description of the reference facilities considered in the CaLby2030 project, the methodology and the definition of the various key performance indicators (KPIs) considered for energy, technical and economic comparisons. The integration of the various reference plants with a MEA solvent-based CO2 capture system is then described and analyzed. These plants are considered as benchmarks for comparing the performance of Calcium Looping (CaL) systems, which are analyzed in detail from an energy, technical and economic point of view for the different sectors in the last part of the deliverable.
D7.2 - Dissemination and communication package – First reporting period
D7.2 details the dissemination and communication activities carried out throughout the first reporting period of the CaLby2030 project, as described in Tasks 7.3 and 7.4. This deliverable will be updated in months 30 and 42